Turkmenbashi Oil Refineriy
Reconsruction Project
| Location | : | BalkanAbad/ Turkmenistan |
| Client | : | Hyundai Engineering (ILK Construction) |
| Scope of Works | : | GMU (Including new Tank Farm), ALK/ISO, VDU, SHOP and CAMP areas |
| Total Area | : | 250,000 m² |

Turkmenbashi Oil Refineriy
Reconsruction Project
| Location | : | BalkanAbad/ Turkmenistan |
| Client | : | Hyundai Engineering (ILK Construction) |
| Scope of Works | : | GMU (Including new Tank Farm), ALK/ISO, VDU, SHOP and CAMP areas |
| Total Area | : | 250,000 m² |
